7th August 2026

August 2026 saw the start of works on site, which take place over the next 12 months, for exciting new Leisure Boxes being created at the Lowry Outlet in Salford.

Working for Developer PEEL, the new works at Upper mall level, form 3No large format leisure Boxes, with 2 already being Pre-Let to Hollywood Bowl, and Hyperdrive (indoor e-Karting).

The works include the formation of the Leisure Boxes, works in the existing Malls in terms of new floor wall and ceiling finishes, new some extract scheme, and replacement Air Handling units.

Deacon and Jones LLP are acting as PM/QS/EA.

£8.5M construction contract.