Leisure/Hospitality

Leisure covers a wide sector. Deacon and Jones have delivered, Hotels, Restaurants, cinemas, visitor centres – both new build and refurbishment.

Bankside Yards, London

Deacon and Jones are proud to be involved in the Bankside Yards redevelopment situated in Southwark.

Having completed the Opus Tower marketing suite in 2025, Deacon and Jones are appointed as Project Managers, Contract Administrators and Quantity Surveyor for the new Gym and Spa facilities that will serve the residential accommodation. The Gym is unusual in that it is to be constructed as a completely independent structure within the Bankside Yards rail arches that serve Blackfriars station across the river. This unusual location creates some unique challenges relating to maintenance access for Network Rail, acoustic isolation from trains overhead, and waterproofing.

 

The Mere, Knutsford

Deacon and Jones LLP are pleased to announce their appointment as the Post Contract QS/Employers Agent role for the extension/refurbishment works at The Mere Hotel and Golf Club.

Working for Developer The Select Group, the works will consist of 4 separate contracts including a Hotel Extension, a refurbishment of the existing Hotel and Conferencing Centre, refurbishment of the Spa and Gatehouse, and external works. The 4 separate contracts will run concurrently, with works starting now on Contract 1, and all contracts come together with a single PC date of December 2025.

117 Guestrooms, Signature Chef Restaurant, Ballroom and Conferencing.

The Hotel will be a Fairmont 5 star Brand.

Deacon and Jones are providing QS/EA services.

£75M + Refurbishment and New Build works.

The Carlton Tower Jumeirah Hotel

Refurbishment contract, to bring back to full glory a Landmark Hotel in Central London. Sitting in the prestigious Knightbridge area of London, and working with Operator Jumeirah, the scheme was to carry out an extensive Front of House refurbishment to Public areas and 179 Guestrooms and suites, with delightful new exquisite interiors to provide 5 star luxury. The Works also provide exciting new Dining opportunities, at The Chinoserie and Al Mare Dining, and The Peak Fitness Club & Spa. Works started on site September 2019, and opened in July 2021.
DATE: On site, September 2019 to July 2021
VALUE: +£90M
ROLE: QS/CA/PM support

JUNCTION, Manchester Central, Manchester

Practical Completion was achieved July 2024, for the new Restaurant/Coffee Shop/Bar linked to, and part of the Manchester Central Convention Centre.

Manchester Central are the owner/developer of a new exciting Leisure/F&B offer and flexible working environment in their Entrance Foyer area: the scheme is a re-purpose of an existing space to provide a coffee bar/bar and restaurant which can operate independent from, or linked to hired events in the Main Hall at Manchester Central. Deacon and Jones are providing QS/CA/PM role for this new venture.

Deacon and Jones delivered PM/QS services on this £2M Fit out scheme.

Architect/Interior Designer UpNorth Architects

The Grand, Birmingham

Refurbishment contract to bring a former City Centre Hotel, back to full glory. Working with Hotelier, Principal Hotel Group, the scheme is take a shell building, and fit out to provide 175 Beds to a 4 star conference facility on Colmore Row. Works are planned to commence January 2018, with an opening date of March 2019.
DATE: On site, Jan 2018 to April 2019
SIZE: 175 Beds, plus conferencing, and restaurants
VALUE: £33m
ROLE: QS

Quayside Media City UK, Salford

May 2023 saw Practical Completion of the new waterside external terraces to new leisure restaurant/bars overlooking the waterside canal basin at Lowry Outlet, Salford.

New external terraces have been formed to extend the existing walkways and provide a scenic view towards Manchester United FC over a waterside setting. The terraces also provide quirky container food/drink outlets beneath the terraces which allow public access directly to the waters edge.

Developer/Landlord : PEEL

Architect : Chapman Taylor

D&J have acted as Quantity Surveyor and Employer’s Agent on this project with a shell cost of £2.7m.

Yotel, Glasgow

Working with StarWood Capital and Yotel, to refurbish a former office building, into a 259Bed Yotel. The works are for complete refurbishment, and turnkey handover : Start on site May 2018, with completion by July 2019.
VALUE: £27m
ROLE: QS
DATES: 2Q 2018 to 3Q 2019

Yotel, Edinburgh

Working with StarWood Capital and Yotel, to refurbish a former office building, into a 280Bed Yotel. The works are for complete refurbishment, and turnkey handover : Start on site August 2017, with completion by December 2018.
VALUE: £22m
ROLE: QS
DATES: Jan 2018- March 2019